HOME PROJECT

PROJECT

  • Combined Cycle Centro Morelos – 724 MW
    22.10.2024 PROJECT
    15,000 m² of IKING rock wool blanket with wire mesh is used in the Combined Cycle Centro Morelos power plant in Mexico. It is a light resin bonded mattress designed for excellent thermal insulation. Insulation Performance: At the ......
  • 360 MW combined-cycle power plant for NewGen Power in Western Australia Perth.
    22.10.2024 PROJECT
    NewGen Power's 360MW combined cycle power plant in Perth, Western Australia refers to the Kwinana Power Station, located approximately 30 kilometers south of the city. Its convenient location holds significant importance for supplying elect......
  • Qatar Ras Laffan Petrochemical Projectd
    13.10.2024 PROJECT
    Project Name: Qatar Ras Laffan Petrochemical ProjectService Area: Pipe InsulationSupplied Product: Rock Wool BoardIKING Rock Wool Pipe: 1500 m³IKING Rock Wool Blanket: 1000 tons China IKING is a manufacturer of......
  • Hong Kong Metro Noise Enclosure Project
    13.10.2024 PROJECT
    Project Name: Subcontract T-039 Construction of Noise Barrier (East and West Diversion Area and Tce Station)Service Area: Hong Kong Subway Noise InsulationSupplied Product: Rock Wool BoardIKING Rock Wool Board: 600 Tons ......
  • 1/1